
Fortell venner om denne varen:
Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Appendices a Through L
U.s. Nuclear Regulatory Commission
Bestillingsvarer
Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Appendices a Through L
U.s. Nuclear Regulatory Commission
The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a ?Framework? that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.
Media | Bøker Pocketbok (Bok med mykt omslag og limt rygg) |
Utgitt | 22. juli 2014 |
ISBN13 | 9781500611316 |
Utgivere | CreateSpace Independent Publishing Platf |
Antall sider | 394 |
Mål | 216 × 279 × 21 mm · 911 g |
Språk | Engelsk |
Mer med U.s. Nuclear Regulatory Commission
Se alt med U.s. Nuclear Regulatory Commission ( f.eks. Pocketbok )