Develop of Neural Network Models to Predict Construction Cost / Duration: Construction Engineering & Management - Asadullah Attal - Bøker - LAP LAMBERT Academic Publishing - 9783659379512 - 19. juni 2013
Ved uoverensstemmelse mellom cover og tittel gjelder tittel

Develop of Neural Network Models to Predict Construction Cost / Duration: Construction Engineering & Management

Pris
NOK 2.149

Bestillingsvarer

Forventes levert 6. - 14. okt
Få varsel om nye utgivelser fra Asadullah Attal
Legg til iMusic ønskeliste
eller

Ikke vurdert ennå

This Publication Contains the Analysis of Prediction of the Future highways Cost and Construction Duration based on the Artificial Neural Network Regression analysis. More than 1500 construction projects data was retrieved and more than 400 projects data was classified as the most important data for this analysis. The most effective factors were also identified by this regression analysis. As a result of this analysis, the outcome was more optimistic than our prediction.

Media Bøker     Pocketbok   (Bok med mykt omslag og limt rygg)
Utgitt 19. juni 2013
ISBN13 9783659379512
Utgivere LAP LAMBERT Academic Publishing
Antall sider 152
Mål 150 × 9 × 226 mm   ·   244 g
Språk Tysk