Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution - Khalid S. Al-gahtani - Bøker - LAP LAMBERT Academic Publishing - 9783843350709 - 13. desember 2010
Ved uoverensstemmelse mellom cover og tittel gjelder tittel

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution

Pris
NOK 659

Bestillingsvarer

Forventes levert 11. - 19. nov
Julegaver kan byttes frem til 31. januar
Få varsel om nye utgivelser fra Khalid S. Al-gahtani
Legg til iMusic ønskeliste
eller

Ikke vurdert ennå

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Media Bøker     Pocketbok   (Bok med mykt omslag og limt rygg)
Utgitt 13. desember 2010
ISBN13 9783843350709
Utgivere LAP LAMBERT Academic Publishing
Antall sider 324
Mål 226 × 18 × 150 mm   ·   476 g
Språk Engelsk